1.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?

2.
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?

3.
Brick walls are measured in sq. m if the thickness of the wall is_________________?

4.
The rate of payment is made for 100 cu m (per % cu m) in case of__________________?

5.
Pick up the correct statement regarding the centre line method of estimating a building?

6.
The following item of earth work is not measured separately ?

7.
The area of the cross-section of a road fully in banking shown in the given figure, is________________?

8.
The measurement is made in square metre in case of_________________?

9.
Cost of fittings and their fixing is specified for the following sanitary fittings________________?

10.
For the construction of buildings, the subheads of the estimate are________________?