In the mid-section formula__________________?
A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
D. All of the above
The rate of an item of work depends on_________________?
A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above
The main factor to be considered while preparing a detailed estimate, is________________?
A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. All the above
The plinth area of a building not includes_________________?
A. Area of the walls at the floor level
B. Internal shaft for sanitary installations up to 2 sq m. in area
C. Lift and wall including landing
D. Area of cantilevered porch
A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more
C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
D. All the above
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Litre for capacity