1.
The switch to backup power must be completed within a deadline of______________________?
2.
Which of the following is represented as an aspect that requests a login name and password ?
3.
Which of the following is a key principle of software design and implementation ?
4.
The average execution time of the power monitor process should be less than__________________?
5.
An example of a system that may use a process pipeline is a _________________________?
6.
Research and development in aspect-orientation has primarily focused on _____________________?
7.
Which of the following is not a type of stakeholder concern ?
8.
Which of the following is core concern in medical record management system ?
9.
The incorporation of advice code at the specified join points by an aspect weaver is called”__________________?
10.
Which of the following concerns best suits the following statement:”Internet banking system includes new customer requirements, account Requirements, customer management requirements, security requirements, recovery requirements etc.” ?
Read More Section(Software Engineering Mcqs)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Advanced Software Engineering Mcqs - (95)
- Architectural Design Mcqs for Software Engineering - (24)
- Basics of Software Engineering - (27)
- Dependability & Security Mcqs for Software Engineering - (48)
- Design & Implementation Mcqs for Software Engineering - (79)
- Requirement Engineering for Software - (80)
- Software Design Mcqs - (50)
- Software Engineering Types - (48)
- Software Evolution Mcqs - (82)
- Software Management Mcqs - (117)
- Software Metrics Mcqs - (37)
- Software Modelling Mcqs - (15)
- Software Processes, Models & Software Development Mcqs - (54)
- Software Reliability & Fault Tolerance Mcqs - (28)
- Software Testing & Quality Management Mcqs - (91)