A project usually has a timeline chart which was developed by_________________?
2.
What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
3.
Every task that is scheduled should be assigned to a specific team member is termed as_________________?
4.
Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as ________________?
5.
What evaluates the risk associated with the technology to be implemented as part of project scope ?
6.
Which of the following is a project scheduling method that can be applied to software development ?
7.
What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
8.
A technique for performing quantitative analysis of progress is known as______________________?
9.
Which of the following is not an adaptation criteria for software projects ?
10.
Which of the following categories is part of the output of software process ?
Read More Section(Software Engineering Mcqs)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Advanced Software Engineering Mcqs - (95)
- Architectural Design Mcqs for Software Engineering - (24)
- Basics of Software Engineering - (27)
- Dependability & Security Mcqs for Software Engineering - (48)
- Design & Implementation Mcqs for Software Engineering - (79)
- Requirement Engineering for Software - (80)
- Software Design Mcqs - (50)
- Software Engineering Types - (48)
- Software Evolution Mcqs - (82)
- Software Management Mcqs - (117)
- Software Metrics Mcqs - (37)
- Software Modelling Mcqs - (15)
- Software Processes, Models & Software Development Mcqs - (54)
- Software Reliability & Fault Tolerance Mcqs - (28)
- Software Testing & Quality Management Mcqs - (91)